Plain-English glossary
Simple explanations of the technical words you will meet when choosing and applying coatings.
- Abrasive blasting
- Shooting grit at a surface at high speed to clean it and give it a slightly rough texture that coatings grip well.
- Chlorides
- Salts, for example from sea air, that speed up the corrosion of steel.
- Corrosion
- The slow damage of a metal caused by a chemical reaction with its surroundings. Rust is the corrosion of iron and steel.
- DFT (dry film thickness)
- How thick the coating is once it has dried, measured in microns. A micron is one thousandth of a millimetre.
- DTM (direct to metal)
- A coating designed to be applied straight onto prepared metal, without a separate primer.
- Epoxy
- A tough coating type that hardens by a chemical reaction. Known for strong adhesion and resistance to chemicals and wear.
- Galvanized steel
- Steel coated with a layer of zinc to protect it from rust.
- Intermediate coat
- A middle layer that adds thickness and a stronger barrier between the primer and the final paint.
- Micron
- One thousandth of a millimetre. A human hair is roughly 70 microns thick.
- Mill scale
- A hard, blue-grey layer that forms on steel when it is made. It can flake off and must be removed before coating.
- Polyurethane (PU)
- A coating type that gives a hard, durable, glossy finish that holds colour well outdoors.
- Pot life
- How long a mixed two-pack coating stays usable. After this time it should not be applied.
- Primer
- The first coat. It grips the prepared surface, helps stop rust and gives the next coats something to hold on to.
- Rebar / TMT bar
- The steel bars placed inside concrete to reinforce it.
- Recoat interval
- The time window in which the next coat can be applied so that it bonds properly.
- Reinforcement steel
- Steel bars used inside concrete structures to give them strength.
- Sa 2.5 (Sa 2½)
- A cleanliness grade for blasted steel. Very thorough: the surface is free of visible oil, dirt, mill scale, rust and old paint, apart from slight staining.
- Salt spray test (ASTM B117)
- A laboratory test where coated panels sit in a salt mist for a set number of hours to compare how well coatings resist corrosion.
- SDS (safety data sheet)
- The document that explains how to handle, store and dispose of a product safely.
- Substrate
- The material being coated, for example steel, aluminium or concrete reinforcement.
- Surface profile
- The tiny peaks and valleys left on steel by blasting. They give the coating more to grip.
- TDS (technical data sheet)
- The official document for a product, with its specifications and instructions for use.
- Topcoat / finish coat
- The final layer. It faces sun, rain, chemicals and wear, and gives the colour and shine.
- Two-pack (2K)
- A coating supplied as two parts, a base and a hardener, that are mixed just before use. They react together to harden.
- VOC
- Volatile organic compounds: solvents that evaporate from paint as it dries. Low VOC means fewer of them.
- Volume solids
- The share of the wet paint that stays behind as dry film once the solvent or water has evaporated.
- Waterborne
- A paint that uses water, rather than solvent, as its main carrier.
- Zinc-loaded primer
- A primer packed with zinc metal particles, which helps protect steel from rusting.
No match. Try another word, or ask our team.
Technical consultation
Still unsure about a term?
Ask our team in plain words. No question is too basic.